Resolved the issue with the concrete bus pad being to high. The section detail didn't have an exact station for the concrete pad so the elevation of the pad was off the approach. But as the drive was built to the plans, the building of the parking lot has the drive a foot lower that what C&E built. Instead of the contractor at the Juvenile center charging the city to put back the approach lower, an agreement was made that C&E will remove the pad and saw cut and remove the East half of the approach and the contractor at the Juvenile center will grade and install the pad and approach.