Excavated material to place the box. The box was placed under an AT&T conduit and AEP conduit (left of the box in the picture).
Exposed the water main located in the road.
Contacted Dave from Michigan Contracting regarding the submittal of the electrical light poles. The issue was that the model number of the poles is not the same as defined in the specs. He is going to send me something that states from the manufacturer the Hapco pole is the same as the Spaulding pole stated in the plans and specs.
No comments:
Post a Comment