Friday, April 29, 2011
Mix Design
Approved mix designs for
Walsh & Kelly asphalt base, base/binder, and surface
Walsh & Kelly concrete curb and sidewalk/approach
Walsh & Kelly asphalt base, base/binder, and surface
Walsh & Kelly concrete curb and sidewalk/approach
Thursday, April 28, 2011
Daily 4/28
Installation of storm pipe continues after three days off this week
due to persistent rains. Site is a bit muddy.
due to persistent rains. Site is a bit muddy.
Wednesday, April 27, 2011
Tuesday, April 26, 2011
Monday, April 25, 2011
Daily 4/25
No work due to rain. The conditions at the site are unsuitable for excavating.
Friday, April 22, 2011
Thursday, April 21, 2011
Wednesday, April 20, 2011
Daily 4/20
Storm pipe installation continues with the addition of a manhole. Site
was a little muddy due the past two days of rain.
was a little muddy due the past two days of rain.
Tuesday, April 19, 2011
Monday, April 18, 2011
Payrolls No 1 & 2
Approved and filed the payrolls for the week ending 4/4/11 and 4/11/11.
Friday, April 15, 2011
Thursday, April 14, 2011
Wednesday, April 13, 2011
Tuesday, April 12, 2011
Monday, April 11, 2011
Daily 4/11
Steps have been pulled out of structures.
Crews are continuing laying pipe in the airport property.
Silt fence was installed today.
Crews are continuing laying pipe in the airport property.
Silt fence was installed today.
Thursday, April 7, 2011
Daily 4/7
24" Storm continues to be installed.
Clearing of road starts.
Found steps are in structures, told Thad and Ian to pull NOT cut out steps.
Clearing of road starts.
Found steps are in structures, told Thad and Ian to pull NOT cut out steps.
Wednesday, April 6, 2011
Tuesday, April 5, 2011
Daily 4/5
Met on sit to discuss tree removal and other things.
Brian McMillen Airport Authority
Dustin Peek Peek's Tree Experts
Thad B. C & E
Brian McMillen Airport Authority
Dustin Peek Peek's Tree Experts
Thad B. C & E